home *** CD-ROM | disk | FTP | other *** search
/ Developer Source 16 / Developer Source Volume 16 (I-MODE Publications, Inc.)(1999).iso / ntvar / jun97 / fedot101.gif < prev    next >
Graphics Interchange Format  |  1998-02-10  |  65KB  |  409x374  |  4-bit (16 colors)
Labels: text | screenshot | document | font | number
OCR: SAMPLE COSTS Topology Initial costs Ongoing costs ISDN Hardware: Network terminator- (NT-1), sometimes included in the BRI monthly charge ($35 to $45), line usage charge (3$ to 124 per terminal adapter or BRI port of a minute per B channel, costs de- rouler), terminal adopter fabout crease os call duration increases) $400, not needed il router has PRI monthly charge (about $450); o BRI port), router port. PRI usage charges were unavailable Line installation [BRI about $140, at press time. PRI about $2,000} Leased line Hardware: DSU/CSU (about Flat rate (can be anywhere from $350 to $1,250), rouler port. around $200 to several thousand dollars, depending on the distance between siles and the speed! Frame relay Hardware: CSU and/or FRAD Flat rate (cost of a leased (obout $1,000), router port. line from the site to the nearest frame relay switch, plus network charges) or per usage, depending on the arrangement made with the provider Table 1: When determining the cost of a line, factor in the hardware and installation costs, as well as fees for line usage and support.